Sam and Beau stopped by Saturday morning to check the site.
Let it Pour
The foundation trenches were inspected and the footings were successfully poured on July 29. Eighty-two cubic yards of concrete!
Digging the Trenches
| permit address sign |
| digging the trenches |
| Elliott and his subs |
| ready to relax |
| looking north |
| looking south |
Subscribe to:
Posts (Atom)