| Happy Thanksgiving, Shell Beach, Siesta Key |
The Best Concrete Work Ever - 11.24.10
| The new garage floor is ultra smooth, has a nice slope and precise control joints. |
| "This is the best concrete work I've ever seen" Elliott said happily. |
| in garage looking at Center Place |
| concrete floor under house |
| barely fits |
| floor for inside stairwell from garage to house |
| from garage looking through connector |
| backyard |
| footer for outside stairway wall |
| stairway to front door will be poured next |
| looking north |
Tuesday Morning 11.23.10
The garage floor concrete pour was delayed this morning, originally scheduled for 7:30, then pushed to 9:30. When 10am rolled around with no concrete truck in sight we left. Will shoot the floor tomorrow. Took a pleasant walk on the beach though and found a sand dollar.
| garage floor waiting to be poured |
| newly filled pool |
| in the trenches |
| in the office |
| peek a boo I see you |
| in the planter |
| tough boots |
Siesta Beach Sand Sculptures
This morning we checked out the sand sculptures on Siesta beach. Afterwards on Lido Shores Elliott pressure washed the inside of the deck planters in preparation of painting this week.
Subscribe to:
Posts (Atom)