4.26.12 - Metal Railing and Travertine Uncovered






Jeremy Alsum of Steel Heart Fabrication welds new stair railing.

Elliott and Hilary at the SAF house tour
Raymond hoses the berries off his Travertine

Travertine uncovered after many months

completed railing



Raymond has worked on the house since last November

Elliott and Raymond admire the stone's beauty


4.22.12 - All Things Electric

a few of the over 80 light bulbs Elliott installed in the 10 - 14 foot ceilings




Elliott installing one of the 110 switch plates, many of them screwless

the flamingo flock preparing to move

4.23.12 - We’re Snappin’ Now

Elliott taking the first truck load packed with plants from Camino Real to Lido Shores
Monarch finds transplanted milkweed in just a day

plants on hold
600 lb. refrigerator is delivered

Elliott's wooden ramp protects the Travertine – Raymond was so relieved the tile wasn't damaged

tight squeeze

Nancy and her crew arrive with the deciduous black olive tree with 3 inch trunk

Nancy gracefully drives the Bobcat – planted the tree on Westway Drive

Happy moon flower on Center Place