November 12 - Final Concrete Beam Pour

Dale pours the last beams atop the guest room and studio

front door viewed from the east

the last pour will include the outdoor stairs leading up to the front door

Dan preps the plywood forms

the garage floor will be part of the last pour

east facade, garage on left, studio above

south facade
southeast corner

dining room on right

lenai roof


along Westway Drive


along Center Place

Dale directing concrete pour above studio



front door viewed from the west, pool in foreground


Dale pouring the last beam

no more sand hill, view from dining room

master bath and bedroom

looking up from the pool into the living room

underneath the house, pool on right


Elliott checks that the conduits in the pool are intact

view from library, of pool and living room

view from lenai into kitchen, dining room and office

master bedroom

living room, dining room and front door