Dale pours the last beams atop the guest room and studio |
front door viewed from the east |
the last pour will include the outdoor stairs leading up to the front door |
Dan preps the plywood forms |
the garage floor will be part of the last pour |
east facade, garage on left, studio above |
south facade |
southeast corner |
dining room on right |
lenai roof |
along Westway Drive |
along Center Place |
Dale directing concrete pour above studio |
front door viewed from the west, pool in foreground |
Dale pouring the last beam |
no more sand hill, view from dining room |
master bath and bedroom |
looking up from the pool into the living room |
underneath the house, pool on right |
Elliott checks that the conduits in the pool are intact |
view from library, of pool and living room |
view from lenai into kitchen, dining room and office |
master bedroom |
living room, dining room and front door |
No comments:
Post a Comment